WHAT DO WE DO
RECENT WORKS
Renewable Gas Projects
Gas Distribution Pipelines
From 10 to 16 bar. Over 2,500 km / 150 valve positions, Regulation and Metering Stations and Metering Stations. Activity - Gas Distribution Pipeline Developed services - Basic routing study, authorisation and construction project, works supervision and management....
Gas Consultancy
Underground distribution Regulation and Metering Stations. Material and design standards for 45 bar gas transmission pipelines. LNG plant design and construction specifications. Design of compact APB 80/35 APA 16/4 Regulation and Metering Station modules. Technical...
Algeciras (Cadiz) Maritime Terminal Expansion
Expansion of maritime hydrocarbon storage and distribution terminal, enabling expansion of storage capacity by 880,803 m3 (total capacity 1.286 million m3). 36 vertical tanks and 400-metre jetty in the Bay of Algeciras. Activity - Storage Farm Services Developed...
Lugo – Villafranca del Bierzo (Leon) Gas Pipeline
115 km long / 9 valve positions / 30" diameter / 80 bar pressure. Activity - Gas Transmission Developed services - Routing study and construction project including environmental impact study, archaeological impact study and cathodic protection project. Related...
LNG Satellite Plants
8 Liquefied Natural Gas plants. Activity - LNG Satellite Plant Developed services - Basic and detailed engineering, works supervision and management, commissioning.
Integral Gasification Plan, Madrid Sierra Norte Zone
Gas Pipeline of 20" diameter / 27 km at 45 bar / 13 valve positions design / design of 9 Regulation and Metering Stations AP45 - AP5 / over 300 km of antennas and distribution networks. Activity - Gasification Plan Developed servicess - Basic routing study,...
Network Simulation
Over 10,000 km / 517 studies. Activity - Network Simulation Developed services - Distribution network dimensioning studies for analysis of their behaviour in new communities and expansions of existing networks.
Gas Distribution Network
Over 25,000 km throughout Spanish territory Activity - Distribution Network Developed services - Basic routing study, authorisation and construction project, works supervision and management.
Gas Transmission Pipelines
From 45 to 80 bar. Over 830 km / 80 valve positions, Regulation and Metering Stations and Metering Stations Benghazi - Tobruk, 432 km long / 34" diameter / 80 bar Bilbao - Treto, 54 km long / 26" diameter / 80 bar Moratalla - Mula, 80 km long / 10" diameter / 59 bar...
AREAS OF ACTIVITY