Plant manufacturing cardboard using recycled paper. Cogeneration plant designed for 8,480 kWe and saturated steam generating capacity of 5,500 kg/h at 8-bar pressure.
Activity – Cogeneration
Developed services -Basic FEL engineering. Basic dimensioning of systems: regulation and metering stations, recovery boilers, cooling towers, water pumps, air compressors, etc. Mass and energy balances.
Principle diagrams. Calculation and dimensioning of circuits. Installation.
Related Projects
Narón (La Coruña) Cogeneration Plant.
Cogeneration Plant in the food industry at Alhama de Murcia (Murcia).
Ronda (Malaga) Trigeneration Plant.
Bilbao sports facility Trigeneration Plant.