Work carried out in:
- 5 Wind Farms
- 38 Hydroelectric Power Plants
- 2 Thermal Power Stations
- 4 Combined Cycle Plants
- 4 Cogeneration Plants
- Substations
- Industrial Plants
- Airports
Activity – Protections
Developed services – Development of test protocols. Adjustment, configuration and verification by means of secondary injection. Testing of measurement and protection transformers: primary injection, polarity, saturation, etc. Checking of wiring, control panels, interconnections, interlocks and lockouts. Loading measurements. Real defect testing.